Completed Projects

Building with Precision, Innovating with Purpose

At ADP Teknologi Sdn Bhd, every project we deliver reflects our commitment to quality, innovation, and sustainability. From water supply systems to wastewater treatment facilities, our completed projects stand as proof of our expertise and dedication to building solutions that make a lasting impact on communities.
Each milestone is more than just a project — it’s a legacy of trust and excellence.

Completed Projects
Forest City - Johor, Malaysia

Scope includes design, supply, construction, installation, testing, commissioning, and maintenance of the completed Sewage Treatment Plant (STP) and sewage pipe works, including civil works, infrastructure, M & E works, and obtaining approvals from the local authorities.

Papar - Sabah, Malaysia

New Papar Water Supply System comprises the construction of a 40 Mld water treatment plant and the associated distribution system consisting of the transmission pipelines serving the surrounding areas of Papar, Kg. Kimanis and Kg. Benom.

Sungai Tong, Terengganu, Malaysia

The Sungai Tong Water Treatment Plant II forms part of the Setiu District Water Supply Project – Phase 2. The plant is designed to provide an additional 37 MLD of treated water to the demand centres in the vicinity, as well as some areas outside the District of Setiu.

Muar River - Durian Tunggal, Melaka

Melaka is a State with limited water resources and experiences severe drought season almost every year. This scheme aims to increase the State water supply by another 110MLD by transferring raw water from the Muar River. The intake is located at Gerisik, Johor, which is approximately. 53km away from the receiving point, Durian Tunggal Dam, Melaka.

Sungai Dua, Pulau Pinang

Design, supply, installation, and commissioning of the water treatment plant, which includes a Dissolved Air Flotation (DAF) plant, treatment process equipment, chemical dosing system, mechanical & electrical equipment, instrumentation, and control system.

Kota Bharu, Kelantan

Design, supply, installation, testing, and commissioning of the treatment processes, chemical plant, treated water pumping plant, Instrumentation, and the associated electrical works of the treatment works.

Sungai Gombak, Selangor

Implementation of a fast-track programme to develop pre-treatment works to augment the existing raw water supply to Wangsa Maju water treatment works.